Kashmir Rays
No Result
View All Result
  • Home
  • J&K
    • Jammu
    • Kashmir
  • Sub-continent
  • Edit
    • Editorial
    • Opinion
  • World
  • Sports
  • More
    • Business
    • Health
    • Science
  • E-Paper
  • Urdu
  • Home
  • J&K
    • Jammu
    • Kashmir
  • Sub-continent
  • Edit
    • Editorial
    • Opinion
  • World
  • Sports
  • More
    • Business
    • Health
    • Science
  • E-Paper
  • Urdu
No Result
View All Result
Kashmir Rays
No Result
View All Result
Home Kashmir

12 years on, Sopore’s Mahrajpora bridge awaits completion

No tendering response, rate escalation leaves bridge in limbo, claims R&B officials

News Desk by News Desk
January 23, 2025
Reading Time: 2 mins read
A A
0
Terrorist killed in ongoing Rajouri encounter: Police
0
SHARES
99
VIEWS
Share on Facebook

Waris Fayaz

Sopore, Jan 23 : Despite elapsing 12 years, a vital Mahrajpora-Shercolony bridge over the river Jhelum, is awaiting completion with the locals brewing strong resentment against the inordinate delay.

RELATED POSTS

Special traffic plan for Darbar Move on Oct 31, Nov 1: DIG Traffic Kashmir

Woman Killed, Minor Girl Among 3 Injured In Tempo Accident In Reasi’s Arnas

The foundation stone of the project was laid by the then Chief Minister Omar Abdullah on December 02, 2013, since then it awaits completion, even as people are accusing authorities for leaving them to face hardships, says administration seems least bothered about it.

Once completed, the bridge is going to connect several villages with Bandipora, Kupwara and Srinagar.

Talking to the news agency—Kashmir News Observer (KNO), Bashir Ahmed, a local said, that the bridge, 205-meter-long, which is to be built on 4 pillars with 9 piles, is being built at the estimated cost of Rs 16 crore, however, despite elapsing 12 years, the bridge is still left as it was. “It seems mere a dream to us,” he said.

“The project was set to complete within three years, however, it missed several deadlines. The pace of work speaks about the seriousness of the authorities,” he added.

Since the work on the bridge was started over a decade ago, so far, only pillars have been raised halfway, said Adil Ahmed, a local resident.

ADVERTISEMENT

Despite the numerous assurances given by the government, the construction of the bridge has been stalled for several years, Adil said.

He said that once the bridge is constructed, it will shorten the distance and connect many villages of outer Sopore including Tarzoo, Panjipora, Hygam and other areas and the people from these areas can travel directly to Bandipora, Kupwara and Srinagar also, he said.

This will decongest the traffic mess in Sopore town, which is persistent since long and yet nobody is bothered to redress the same, the locals added.

While urging the government to direct the authorities concerned to ensure completion of the bridge at an earliest, they said that they have brought the issue into the notice of higher ups several times but there is no progress on the ground.

The bridge earlier was being constructed by the Jammu and Kashmir Project Construction Corporation (JKPCC), however, was later on handed over to the Roads and Buildings (R&B) department, division Sopore.

“We had proposed its tender several times but there was no response from contractors,” the then Deputy General Manager (DGM) JKPCC, Masood Ahmed had told KNO earlier.

Meanwhile, an official in the R&B department, Sopore, told KNO that the project falls under their jurisdiction now; however, the situation is the same as it was during JKPCC time. “There is no tendering response,” he said.

“Escalation of rates is the reason behind, but we have called contractors for the mediation. Hopefully, things will settle, which will pave a way for its early completion,” he added—(KNO)

ShareTweetSendShare
Previous Post

PM Modi praises J&K, Ladakh for elevating country’s sports culture

Next Post

Day, night temp settle above normal in Kashmir

Related Posts

154‑year‑old tradition of Durbar Move continues

Special traffic plan for Darbar Move on Oct 31, Nov 1: DIG Traffic Kashmir

October 29, 2026
Vehicle crushes Railway policeman to death in Qazigund

Woman Killed, Minor Girl Among 3 Injured In Tempo Accident In Reasi’s Arnas

October 29, 2026

Pedal Through Paradise’ Cycle Race: J&K Police Sets Up 28 Gyms Across UT; 6000 Participation In Kashmir Marathon Highest So Far, Says DGP Nalin Prabhat; Announces Martyrs Memorial Tournaments

Man Injured In Bear Attack In Aishmuqam Anantnag

Youth are J&K’s strength, must stay away from drugs: LG Sinha

In Major Administrative Move, LG Manoj Sinha Allocates Portfolios To 8 Ministers; Deputy CM Surinder Choudhary Gets PWD, Industries

4000 cyclists register for ‘Pedal Through Paradise’: DIG Maqsood-ul-Zaman

No Significant Weather In J&K Till Nov 6, Brief Light Rain/Snow Expected At Isolated Places On Oct 29: MeT

Boulevard Road To Remain Closed Tomorrow From 7:00 AM: Traffic Police Issues Advisory For J&K Police Cycle Race ‘Pedal Through Paradise’ In Srinagar

Next Post
Kashmir, Ladakh Under Deep Freeze; Srinagar Sees Season’s Coldest Night At Minus 3.6°C

Day, night temp settle above normal in Kashmir

NDMA issues ‘very high forest fire risk’ alert for J&K

NDMA issues ‘very high forest fire risk’ alert for J&K

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

THE LATEST

Special traffic plan for Darbar Move on Oct 31, Nov 1: DIG Traffic Kashmir

Woman Killed, Minor Girl Among 3 Injured In Tempo Accident In Reasi’s Arnas

Pedal Through Paradise’ Cycle Race: J&K Police Sets Up 28 Gyms Across UT; 6000 Participation In Kashmir Marathon Highest So Far, Says DGP Nalin Prabhat; Announces Martyrs Memorial Tournaments

Man Injured In Bear Attack In Aishmuqam Anantnag

Youth are J&K’s strength, must stay away from drugs: LG Sinha

In Major Administrative Move, LG Manoj Sinha Allocates Portfolios To 8 Ministers; Deputy CM Surinder Choudhary Gets PWD, Industries

4000 cyclists register for ‘Pedal Through Paradise’: DIG Maqsood-ul-Zaman

No Significant Weather In J&K Till Nov 6, Brief Light Rain/Snow Expected At Isolated Places On Oct 29: MeT

Boulevard Road To Remain Closed Tomorrow From 7:00 AM: Traffic Police Issues Advisory For J&K Police Cycle Race ‘Pedal Through Paradise’ In Srinagar

Boy, 6, stuck to death by dumper in Kulgam

UPDATED : Two Youth Buried Alive Under Sand During Extraction In Baramulla, Die

Two Youth Drown While Extracting Sand From Jhelum In Baramulla, Bodies Recovered Next Morning

Denied Ministerial Berth, Senior NC Leader Mubarak Gul To Reveal Future Course Next Week Amid Workers’ Protest

About

Kashmir Rays is a daily Urdu language newspaper from Srinagar, Jammu and Kashmir. We are committed to uphold the principles of free and fair journalism. Our motto is to provide true reportage of events as they unfold.

News By Topic

  • Business
  • Editorial
  • Education
  • Health
  • In Pics
  • Jammu
  • Kashmir
  • Ladakh
  • Latest
  • Lead
  • Local
  • Opinion
  • Politics
  • Press Release
  • Rajouri
  • Science
  • Second Lead
  • Sports
  • Sub-continent
  • Tech
  • Uncategorized
  • Video
  • Weather
  • World

More Info

  • Disclaimer
  • Team
  • Contact Us
  • About

© 2021 Kashmir Rays | Designed by Buucket

No Result
View All Result
  • Home
  • J&K
    • Jammu
    • Kashmir
  • Sub-continent
  • Edit
    • Editorial
    • Opinion
  • World
  • Sports
  • More
    • Business
    • Health
    • Science
  • E-Paper
  • Urdu

© 2021 Kashmir Rays | Designed by Buucket