Kashmir Rays
No Result
View All Result
  • Home
  • J&K
    • Jammu
    • Kashmir
  • Sub-continent
  • Edit
    • Editorial
    • Opinion
  • World
  • Sports
  • More
    • Business
    • Health
    • Science
  • E-Paper
  • Urdu
  • Home
  • J&K
    • Jammu
    • Kashmir
  • Sub-continent
  • Edit
    • Editorial
    • Opinion
  • World
  • Sports
  • More
    • Business
    • Health
    • Science
  • E-Paper
  • Urdu
No Result
View All Result
Kashmir Rays
No Result
View All Result
Home Kashmir

After tragedy, construction work on vital Gandbal bridge resumes after long delay

Bridge to be completed by June this year: Chief Engineer R&B dept

News Desk by News Desk
April 22, 2024
Reading Time: 1 min read
A A
0
Terrorist killed in ongoing Rajouri encounter: Police
0
SHARES
9
VIEWS
Share on Facebook

Rehan Qayoom Mir

Srinagar, Apr 22 : Days after the six persons drowned to death in a boat capsizing incident at Gandbal area of Batwara, the authorities in Roads and Building (R&B) department here have started the construction work of the bridge in the locality.

RELATED POSTS

Kashmir to Kanyakumari no longer a dream: PM Modi

ICAR-CITH and KVK Baramulla Conduct Farmer Outreach Under Viksit Krishi Sankalp Abhiyan

Poignantly, on April 16, a pall of gloom descended throughout Kashmir after a boat ferrying 15 people capsized in the River Jhelum at Gandbal, leaving six persons dead while three persons, including a father-son duo and another minor boy, remained missing on the 6th day.

An official from Roads and Building (R&B) told the news agency—Kashmir News Observer (KNO), that work was already ongoing on the Batwara-Gandabal bridge. It took a break after the boat capsized incident but resumed two days after the incident, this time at full pace, he said.

He added that some technical issues have led to the delay in the construction work. Besides, the delay in getting the funds released also played a spoilsport, he added.

Moreover, Sajad Ahmad Naqeeb, Chief Engineer R&B department, told KNO that the work was already going on even before the incident and has been resumed two days after the unfortunate incident took place.

“The construction of the Gandabal-Batwara bridge started in the year 2017 with an estimated cost of Rs 3.67 crores, and later some technical issues led to the delay in the construction work,” Naqeeb said.

ADVERTISEMENT

Also, locals from Batwara and Gandabal areas requested the administration to speed up the work on Gandabal Bridge—(KNO)

ShareTweetSendShare
Previous Post

GMC Jammu, Srinagar Prepare for Robotic Surgery, Promises Enhanced Patient Care

Next Post

Power perils: Kashmir to go for extra power curtailment

Related Posts

Kashmir to Kanyakumari no longer a dream: PM Modi

Kashmir to Kanyakumari no longer a dream: PM Modi

June 6, 2025
ICAR-CITH and KVK Baramulla Conduct Farmer Outreach Under Viksit Krishi Sankalp Abhiyan

ICAR-CITH and KVK Baramulla Conduct Farmer Outreach Under Viksit Krishi Sankalp Abhiyan

June 5, 2025

Ahead of inaugurating Kashmir train, PM Modi terms June 6 as special day for J&K people

ACB arrests 2 forest officials for demanding, accepting Rs 11,000 bribe

AABHAR: M3M Foundation and Indian Army Honour Amarnath Yatra Helpers at Gujjar–Bakarwal Mela in Aishmuqam

J&K Contractors Coordination Committee Urges Immediate Release of ₹1000 Cr JJM Payments Ahead of Eid-ul-Adha

Ahead of Eid, Food Safety team Srinagar conducts special market inspections

Vande Bharat will benefit us, closure of highway to have least impact now: CM Omar

Direct train between Jammu and Srinagar will run in September: Union Minister

Next Post
Doda, Kishtwar districts get reliable connectivity with the electricity grid

Power perils: Kashmir to go for extra power curtailment

14 injured as militants target police bus on Highway near Zeewan Srinagar

TA Soldier’s Brother Killed In Firing By Militants In Rajouri

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

THE LATEST

Kashmir to Kanyakumari no longer a dream: PM Modi

ICAR-CITH and KVK Baramulla Conduct Farmer Outreach Under Viksit Krishi Sankalp Abhiyan

Ahead of inaugurating Kashmir train, PM Modi terms June 6 as special day for J&K people

ACB arrests 2 forest officials for demanding, accepting Rs 11,000 bribe

AABHAR: M3M Foundation and Indian Army Honour Amarnath Yatra Helpers at Gujjar–Bakarwal Mela in Aishmuqam

J&K Contractors Coordination Committee Urges Immediate Release of ₹1000 Cr JJM Payments Ahead of Eid-ul-Adha

Ahead of Eid, Food Safety team Srinagar conducts special market inspections

Vande Bharat will benefit us, closure of highway to have least impact now: CM Omar

Direct train between Jammu and Srinagar will run in September: Union Minister

Kashmir Advocate’s Association Unveils New Managing Body; Advocate Waseem Gul to Continue as President

NCDC Core Committee Demands Holistic Curriculum Reforms in All Levels of Education

NIA searches 32 locations across J&K against terror ecosystem

Terror Case: NIA Raids Multiple Locations Across Valley

About

Kashmir Rays is a daily Urdu language newspaper from Srinagar, Jammu and Kashmir. We are committed to uphold the principles of free and fair journalism. Our motto is to provide true reportage of events as they unfold.

News By Topic

  • Business
  • Editorial
  • Education
  • Health
  • In Pics
  • Jammu
  • Kashmir
  • Ladakh
  • Latest
  • Lead
  • Local
  • Opinion
  • Politics
  • Press Release
  • Rajouri
  • Science
  • Second Lead
  • Sports
  • Sub-continent
  • Tech
  • Uncategorized
  • Video
  • Weather
  • World

More Info

  • Disclaimer
  • Team
  • Contact Us
  • About

© 2021 Kashmir Rays | Designed by Buucket

No Result
View All Result
  • Home
  • J&K
    • Jammu
    • Kashmir
  • Sub-continent
  • Edit
    • Editorial
    • Opinion
  • World
  • Sports
  • More
    • Business
    • Health
    • Science
  • E-Paper
  • Urdu

© 2021 Kashmir Rays | Designed by Buucket